Micro & Edge Data Centers
Deploy local compute and storage infrastructure at branch offices, remote facilities, warehousing hubs, and distributed industrial sites without constructing costly dedicated server rooms.
Required Site Selection Inputs:
Available facility electrical feed (Single-phase 230V or 3-phase 415V), floor loading capacity, available footprint, and target IT compute load capacity (kW).
Integrated Configuration Scope:
- ✔ Enclosure: Sealed, sound-attenuated 19" rack enclosure with smart glass door
- ✔ Power: Online rackmount double-conversion UPS with hot-swap battery modules
- ✔ Distribution: Monitored/switched PDU with per-outlet True RMS ±1% metering
- ✔ Cooling: DC inverter precision rack air conditioner (1.5 kW to 7.0 kW)
- ✔ Telemetry: 10-inch capacitive touch screen with temperature, humidity, and water leak alarms
- ✔ Security: Electronic swipe-card / PIN door access control with audit log
Multi-Site Standardization Benefits:
- ✔ Repeatable Blueprint: Standardized physical architecture deployed identically nationwide
- ✔ Zero Onsite Rework: Pre-engineered, factory sweep-tested, plug-and-play assembly
- ✔ Centralized DCIM: SNMPv3 telemetry feeds all site metrics directly to corporate BMS
- ✔ Physical Tamper Resistance: Prevents unauthorized server access in multi-tenant facilities
Enterprise & Distributed IT Infrastructure
Plan repeatable, standardized physical layer architectures for corporate headquarters, regional hospitals, retail logistics hubs, and banking campuses across multi-site footprints.
Application Focus & Connectivity Fit:
Combines Nexis server enclosures and aisle containment with certified CAT6/CAT8 copper structured cabling, fiber backbone trunks, and enterprise optical transceivers for zero-hassle site rollouts.
High-Density & AI Liquid Cooling
Direct-to-Chip (D2C) liquid cooling and full liquid immersion tanks designed to support extreme heat densities of AI training accelerators, GPU compute clusters, and high-frequency compute clusters exceeding 100 kW per rack.
Verified Compatibility & Facility Interfaces:
Compatible with non-conductive dielectric engineered fluids. Requires external facility cooling water loop (chilled water or dry cooler) connected to the NexisImmersion CDU heat exchanger.
Approved Hardware Models:
Note: Performance, flow rate, and heat rejection ratings are verified according to defined facility water supply conditions.
Authoritative Shared Products Linked:
Data Center Connectivity & Optical Upgrades
Plan high-density optical fiber trunking, ultra-low-loss MPO/MTP cross-connects, and optical transceiver upgrades from 10G/25G to 100G, 400G, and 800G leaf-spine fabrics.
Link Requirements & Selection Inputs:
Maximum channel insertion loss budget, optical reach (SR4 / LR4 / CWDM4 / DR4), polarity management (Method A/B/C), and overhead cable tray fill capacity.
Data Center Engineering Matrix & Reliability Standards
Physical infrastructure engineered and verified to meet Tier III and Tier IV data center availability criteria.