Your edge data center, delivered ready to run.
Racks, precision cooling, UPS, monitoring and connectivity, integrated and tested before dispatch, then installed and supported by our own engineers across India.

The connectivity behind India's networks.
Optical fiber cable, fiber management, transceivers, RF and DAS, copper and power connectivity, made in our own Indian plants and tested before every dispatch. Supplying operators and OEMs since 2015.

From connectivity to compute
Semita’s journey began with the infrastructure connecting people, networks and businesses. Building on our experience in telecom and optical connectivity, we are extending our capabilities into the physical infrastructure that supports enterprise computing, edge deployments and modern data centers.
Through Semita Nexis, we bring these worlds together—connecting the network to the infrastructure that powers digital transformation.
"/>Step 1 · Since 2015Telecom sites
RF jumpers, AISG, fronthaul, DC power and grounding for India's 4G and 5G roll-outs.
"/>Step 2Fiber networks
Cable from 2F to 288F, splitters, closures and patching for the FTTH build-out, made in our plants.
"/>Step 3 · Semita NexisEdge data centers
NexisRack micro data centers bring cooling, power and monitoring into one factory-tested cabinet.
"/>Step 4 · TodayAI at the edge
NexisImmersion tanks and the Edge AI Pod run GPU servers at full power, near-silently.
Everything your edge site needs, from one team
Choose a single product or a pre-integrated package. Each line is engineered for Indian sites, power conditions and support needs.
"/>NexisRack micro data centers
A complete server room in one to five sealed cabinets: IT space, online UPS, precision cooling, monitoring, access control and optional fire suppression.
"/>NexisImmersion liquid cooling
All-in-one immersion tank cabinets for AI, GPU and HPC servers. Tank, circulation and heat exchange in one unit, with no separate CDU or plant room.
"/>Data center connectivity
MPO/MTP high-density fiber, optics to 400G, Cat6A and Cat8 copper and out-of-band management, designed together with the rack.
"/>Racks & enclosures
IT and network racks to 45U, high-density racks to 48U, and IP65 outdoor telecom cabinets.
Compare enclosures
"/>Every cabinet on one screen
Power, UPS, cooling, temperature, humidity, smoke, leaks and doors, on site and by web, app and SMS.
About monitoringReady for AI at the edge
The Nexis Edge AI Pod pairs a NexisRack row with a NexisImmersion tank and Nexis Connect cabling. You get air-cooled IT and liquid-cooled GPU compute in one footprint, with one delivery and one support contract.
- NexisRack NXM-2 / 3Network, storage and management in a sealed, cooled row
- NexisImmersion NXL-20 / 40GPU servers at full power in a single-unit tank
- Nexis ConnectMPO/MTP trunks, 400G optics and DAC inside the tank
- Nexis MonitorOne view across cabinets and tank
"/>Why teams choose Semita Nexis
One team, one point of accountability
Rack, power, cooling, monitoring and connectivity from one team. No finger-pointing between five vendors.
Pre-integrated, not site-assembled
Built, wired and tested as one machine before dispatch. On-site installation and commissioning take a few days.
Less floor space than a room
Sealed hot and cold aisles let a NexisRack replace a conventional server room in about 40% less area.
Built for Indian sites
Designed for variable grid power, dust, heat and tight spaces in branches, plants and remote locations.
Local engineering and support
Our engineers survey, install, commission and service. 12-month system warranty, with annual maintenance contracts.
Integrated before dispatch. Running on day one.
Site check
Power, space, access, environment and planned workloads.
Design
NXM or NXL model, battery runtime, cabling plan and layout.
Integrate & test
Assembled, wired and tested as one system before dispatch.
Install
Ships as one unit and is commissioned on site in days.
Support
Remote monitoring, preventive maintenance and service.
Built for the places your data lives
Enterprise branches & offices
Replace the cluttered server room with one secure, monitored cabinet.
NexisRack NXM-1 · NXM-2Banks & financial services
Resilient branch and regional compute with 2N power and logged door access.
Branch Micro DC packageFactories & industrial sites
Sealed, dust-resistant IT next to the production line.
NexisRack NXM-3 · NXM-5Telecom & edge operators
Edge nodes and outdoor cabinets that deploy quickly at towers and aggregation sites.
NexisODC · NXL-04 for BBUsSystem integrators
A pre-tested data center platform you can resell, install and support with us.
Integrator programmeAI, research & universities
On-prem GPU inference and labs without building a chiller plant.
Edge AI Pod · NXL-20 / 40Questions buyers ask us first
Straight answers on space, power, timelines and support. More detail is on each product page.
All FAQsDo I need a dedicated server room?
No. NexisRack cabinets are sealed to IP50 standard (IP55 optional) with closed hot and cold aisles and run at 49 dB or less at full load, so they work in offices, branches, factory floors and telecom sites. The cooling unit needs an outdoor condenser position nearby.
How long from order to go-live?
Typically 6 to 10 weeks for NexisRack and 8 to 12 weeks for NexisImmersion, depending on configuration. Installation and commissioning on site take a few days.
What happens if the cooling fails?
Emergency fans of up to 5 kW start automatically and alarms go out at once by screen, web, app and SMS. Larger systems can run N+X cooling redundancy.
Who supports the system after installation?
Semita does. You get 12 months of warranty on the integrated system from commissioning, and annual maintenance contracts cover preventive visits, battery health checks and priority call-out.
Will immersion cooling affect my server warranty?
Standard servers may lose vendor warranty once immersed. For vendor backing, choose an immersion-ready server family and the fluid it was validated with. We can share the list.
How we design for real sites
Reference deployment designs that show how we scope each type of project. Ask us for customer references in your sector.
Branch micro data centers for a multi-state bank
A standard NXM-1 design replaces improvised branch server rooms with sealed, monitored cabinets.
Read the design AI & GPU computeImmersion-cooled GPU inference in an office
A single NXL-20 tank runs four 4U GPU servers in an ordinary office, with no new chiller plant.
Read the design ManufacturingEdge hub on a manufacturing campus
A five-cabinet NXM-5 brings plant systems, MES and video analytics into a sealed, N+1 cooled row on the shop floor.
Read the designThe connectivity behind India's networks
Since 2015 we have manufactured the optical, RF, copper and power connectivity that India's telecom operators and broadband providers rely on. The same engineering and testing discipline goes into every data center we deliver.
- Optical fiber cable 2F–288F: drop, ADSS, armoured, riser and hybrid
- Splitters, FAT boxes, FMS/ODF, joint closures and patch cords
- Optical transceivers from 1G to 400G
- Low-PIM RF jumpers, AISG, antennas and DAS/IBS
- CAT6 copper, RRU/BBU power and grounding
"/>Trusted by operators and OEMs
Operators, OEMs and system integrators supplied by Semita Technologies.
"/>
"/>
"/>
"/>
"/>
"/>
"/>Certified, tested, accountable
Every optical assembly is insertion-loss and return-loss tested, and every RF assembly is PIM and VSWR swept, before it ships. Test records travel with the order.
Datasheets & brochures
Forward them to your IT, facilities and procurement teams.
Planning an edge site or an AI workload?
Tell us about your site, IT load and timeline. An engineer will come back within one business day with a recommended configuration.
"/>
"/>
"/>