4G/5G physical layer, tower to shelter.
Everything between the antenna and the baseband: RF jumpers, AISG control, hybrid fiber trunks, DC power, grounding, timing and outdoor cabinets, tested for PIM and VSWR before they reach the site.

- PIM (4.3-10)
- ≤ -160 dBc
- eCPRI fronthaul ready
- 25G
- All-weather tower gear
- IP68
- Sweep tested
- 100%
Scope of supply
Semita supplies
- RF coaxial jumpers and AISG cables
- Armoured hybrid fiber and FTTA jumpers
- Industrial 10G/25G transceivers
- -48 V DC power feeds and grounding
- Surge protection, clamps, weatherproofing
- NexisODC outdoor cabinets
Partners handle
- Civil and structural works
- Steel mast erection
- Active RAN commissioning
Tower-to-shelter topology

Zone A · Mast head & antennas
Antenna arrays and remote radio units.
- ½″ superflex low-PIM RF jumpers
- AISG 2.0/3.0 RET control cables
- IP68 breakout and junction enclosures

Zone B · Vertical trunk
Hybrid trunking and shielded DC feeds.
- Armoured multi-core hybrid cables
- Shielded -48 V DC power feeds
- Stainless feeder clamps, hoisting grips

Zone C · Shelter or outdoor cabinet
Baseband, timing and grounding.
- 10G CPRI and 25G eCPRI SFP28
- GPS/GLONASS timing antenna
- Master grounding busbar, SPDs
- NexisODC NXO-05/10 cabinets
Deployment blueprints
Macro cell
5G massive MIMO macro sites: 25G eCPRI trunking, 4.3-10 low-PIM jumpers, Class 5 shielded -48 V DC.
In-building (IBS/DAS)
Airports, stadiums and high-rises: wideband splitters, ceiling and panel antennas, low-loss feeders.
Small cell & rooftop
Pre-terminated FTTA drops, IP68 street boxes, pole clamps and NexisODC NXO-05.
Hub & C-RAN
BBU pools with 144F/288F ODF patching, CWDM/DWDM and dual-feed rack power.
Quality benchmarks
| Parameter | Benchmark | Standard |
|---|---|---|
| PIM | ≤ -160 dBc (4.3-10), ≤ -155 dBc (7/16 DIN) | IEC 62037 |
| VSWR | ≤ 1.12 (698–2700 MHz), ≤ 1.15 (2700–3800 MHz) | IEC 61169-54, MIL-STD-202 |
| Optical loss | IL ≤ 0.20 dB; RL ≥ 55 dB UPC, ≥ 65 dB APC | IEC 61753 |
| Ingress | IP68 mated; 720 h salt mist | IEC 60529, ASTM B117 |
| Fire | LSZH, flame retardant, UV resistant | IEC 60332-1, 60754, 61034-2 |
| Temperature | -40 °C to +85 °C | Telcordia GR-326, GR-468 |
Products in this solution

RF, Antennas & DAS/IBS
Low-PIM RF interconnect, antennas and in-building coverage products for 4G and 5G, tested for PIM and VSWR before dispatch.
View
Power Connectivity
DC power feeds, armoured cable and grounding for telecom sites and equipment rooms, factory-terminated to length.
View
Telecom Site Accessories
Surge protection, clamps, connectors and weatherproofing that finish a 4G/5G site properly.
View
Optical Transceivers
MSA-compliant optics from 1G to 400G with full digital diagnostics, coded for the switch or router you run.
View
"/>NexisODC Outdoor Cabinets
IP65 ODU cabinets with heat exchanger cooling and -48 V DC distribution for the shelter-free site.
ViewTelecom Infrastructure (4G/5G): Deployment Scope & FAQs
How Semita Technologies engineers, tests and supports Telecom Infrastructure (4G/5G) across Indian enterprise, telecom and edge data center sites.
Factory Integration & 100% Pre-Dispatch Testing
Every system and connectivity assembly supplied by Semita Technologies is built under ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 quality management across our five Indian manufacturing units in Bengaluru, Mysore, Bhiwadi and Surat. Optical assemblies undergo 100% insertion-loss and return-loss verification, RF assemblies are PIM and VSWR swept, and micro data center racks undergo full thermal and UPS load testing prior to dispatch.
Pan-India Site Check, Installation & SLA Support
Our own field engineering teams conduct pre-deployment site checks covering power, earthing, floor loading, thermal heat rejection and cable pathways. We deliver complete bills of quantities (BOQs), CAD layout drawings, on-site commissioning and annual maintenance contracts (AMC) with 24×7 remote telemetry monitoring and guaranteed response SLAs.
How quickly can Semita Technologies deliver and commission Telecom Infrastructure (4G/5G) in India?
Standard connectivity, optical transceivers, fiber cables and rack accessories ship from our Indian plants within 1 to 3 weeks. Pre-integrated NexisRack micro data centers typically ship in 6 to 10 weeks and NexisImmersion liquid cooling systems in 8 to 12 weeks, with on-site installation and commissioning completed in a few days.
Can Semita Technologies customize configurations and provide project BOQs?
Yes. Our application engineers size and customize fiber core counts, trunk breakout lengths, transceiver vendor coding, rack U-heights, UPS battery runtimes and cooling capacities to match your exact site and workload. Contact our engineering team at sales@semita.in or +91-92122-94293 for a tailored BOQ within one business day.
What certifications and test reports accompany each shipment?
All deliveries include factory serialized test reports (OTDR traces, IL/RL certificates, PIM sweep charts or integrated rack FAT protocols) along with ISO 9001/14001/45001, RoHS, CE and applicable DoT/TEC conformity documentation.
Send us your site BOQ
Frequency bands, lengths and connector types. We quote within 24 hours and can kit each site.