Brochures & Technical Guides Semita Technologies Corporate Overview & Product Specifications Corporate Brochure
Home / Semita Nexis / Nexis Connect
Nexis Connect · Physical layer connectivity

The cabling layer, engineered with the rack.

High-density MPO/MTP® fiber, optical transceivers up to 400G, structured copper and out-of-band management, designed and certified by the team that delivers your NexisRack and NexisImmersion systems.

Pre-Terminated Optical Interconnect

Engineered with the rack

Base-8, Base-12, Base-16 and Base-24 pre-terminated assemblies designed to your exact cabinet layout, eliminating field termination errors and streamlining high-density data center deployments.

⚡ Low Loss: ≤ 0.12 dB Elite ferrule insertion loss
🔬 Testing: 100% interferometer geometry & Tier-1 loss certified
🏷️ Labeling: TIA-606-C laser-printed port documentation
MPO/MTP® high-density fiber

Factory-terminated fiber that installs in minutes.

MPO/MTP® connectors carry 8, 12, 16 or 24 fibers in one push-pull interface. Pre-terminated and tested before shipment, they remove field splicing and turn speed upgrades into a cassette swap.

  • Trunks in OM3, OM4, OM5 multimode and OS2 single-mode, cut to length
  • MPO-to-LC cassettes and fan-out harnesses
  • High-density 1U, 2U and 4U enclosures with slide-out trays
  • Low-loss connectors for tight optical budgets
  • APC polish for single-mode parallel optics such as 400G DR4
  • Insertion-loss and return-loss reports with every assembly
KEY UP 123456789101112 TIA-598 color order · fibers 1–12 SR4 / DR4 optics use fibers 1–4 (Tx) and 9–12 (Rx) Base-8 trunks carry exactly those eight

Match the trunk to the optics

Architecture Connector Typical applications Why choose it
Base-8MPO-8 / MPO-12 (8 used)40G SR4, 100G SR4, 400G DR4, 4 × 100G breakoutFull fiber use with parallel optics
Base-12MPO-12Legacy 10G fan-outs, structured backboneMatches existing 12-fiber plant
Base-16MPO-16400G SR8, 800G SR8, 2 × 400G breakoutPath to 800G without re-cabling
Base-24MPO-24High-count trunksMost fibers per connector in tight pathways
PolarityMethod A, B and C, documented per link
Fiber typesOM3, OM4, OM5; OS2 with UPC or APC
TestingFactory IL/RL plus on-site Tier 1 certification
DensityFull spine-leaf counts in 1U–4U
Optical transceivers

10G access to 400G spine.

MSA-compliant optics with DDM/DOM diagnostics, coded for your switch and NIC platforms and tested in host equipment before dispatch.

10G SFP+ SR · LR · ER
25G SFP28 SR · LR
40G QSFP+ SR4 · LR4
100G QSFP28 SR4 · CWDM4 · LR4
200G QSFP56 SR4 · FR4
400G QSFP-DD · QSFP112 SR8 · DR4 · FR4 · LR4
Optic Fiber Connector Typical reach Where it fits
400G SR8OM4MPO-16100 mLeaf-to-spine within a hall
400G DR4OS2MPO-12 APC500 mSpine links; 4 × 100G breakout
400G FR4OS2Duplex LC2 kmBetween halls and buildings
400G LR4OS2Duplex LC10 kmMetro and edge interconnect
100G SR4OM4MPO-12100 mServer and leaf uplinks
100G LR4OS2Duplex LC10 kmEdge sites to core
DAC & AOCCopper for in-rack, active optical for adjacent racks
Breakouts400G → 4 × 100G, 100G → 4 × 25G
Platform codingValidated for your switch and NIC vendors
DiagnosticsTemperature, voltage, bias and optical power
Structured copper

Copper built for 10G and beyond.

  • Cat6A shielded and unshielded for 10GBASE-T up to 100 m
  • Cat8 for 25G/40GBASE-T on runs up to 30 m
  • Pre-terminated copper trunks for fast rack installs
  • High-density flat and angled panels, 48 ports in 1U
  • Slim, color-coded patch cords for airflow and port management
  • Every link labeled and certified against TIA/ISO limits
Out-of-band management

A back door you can always reach.

  • Dedicated management switching, separate from production
  • Console servers for serial access to network equipment
  • Optional cellular failover for remote sites
  • Cabling for IPMI, iDRAC and iLO management ports
  • Integration with NexisRack monitoring and smart PDUs
  • Built for unmanned edge sites and multi-site rollouts
━ MPO/MTP® trunks · 400G optics ━ Cat6A / DAC to servers ┅ Out-of-band management SPINE 400G SPINE 400G LEAF / ToR LEAF / ToR LEAF / ToR OUT-OF-BAND · console servers · IPMI / iDRAC / iLO · smart PDUs · NexisRack monitoring
Design · install · certify

Delivered as a tested, documented system.

  1. 01

    Port design

    Port maps, fiber counts, polarity plans and tray routing for ToR, EoR or MoR.

  2. 02

    Pre-termination

    Trunks and harnesses built to measured lengths, tested and labeled in the factory.

  3. 03

    Install

    Panels, cassettes and cable management fitted inside your NexisRack cabinets.

  4. 04

    Certify

    Fiber and copper certified against TIA and ISO limits, with per-link results.

  5. 05

    Document

    TIA-606 labeling and as-built records so every port stays traceable.

Plan your site

Tell us the load. We'll size the system.