From a branch server room to a GPU inference cluster: Semita Nexis delivers racks, cooling, cabling and monitoring as one engineered system.

Four application areas
Micro & edge data centers
Branches, warehouses, remote and industrial sites, standardised for multi-site roll-outs.
Learn moreEnterprise & distributed IT
Central monitoring through your BMS and tamper-resistant cabinets in shared buildings.
Learn moreHigh-density & AI cooling
Single-unit immersion for GPU clusters and high-frequency compute.
Learn moreConnectivity & upgrades
Moving from 10/25G to 100/400G leaf-spine fabrics.
Learn morePackaged solutions

Nexis Edge AI Pod
Air-cooled IT and immersion-cooled GPUs in one footprint, cabled for 400G and monitored from one screen.
View package
Branch Micro DC
A complete branch server room in 0.72 m²: NXM-1 with 3 kVA UPS, 28U IT space and monitoring.
View package
GPU Inference Node
A single 21U NexisImmersion unit for GPU servers: NXL-20 or NXL-40.
View package
400G-Ready Cabling
Pre-terminated fiber and copper, certified and documented at handover.
View packageEngineering benchmarks
| Benchmark | Value |
|---|---|
| NexisRack PUE | ≤ 1.4 |
| NexisImmersion cooling PUE | close to 1.0 |
| NXH rack load | 2500 kg static, 1500 kg dynamic |
| MPO/MTP Elite insertion loss | ≤ 0.12 dB |
| NexisRack noise | ≤ 49 dB at full load |
| Backup runtime | 15–120 minutes |
Data Center & Edge: Deployment Scope & FAQs
How Semita Nexis engineers, tests and supports Data Center & Edge across Indian enterprise, telecom and edge data center sites.
Factory Integration & 100% Pre-Dispatch Testing
Every system and connectivity assembly supplied by Semita Nexis is built under ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018 quality management across our five Indian manufacturing units in Bengaluru, Mysore, Bhiwadi and Surat. Optical assemblies undergo 100% insertion-loss and return-loss verification, RF assemblies are PIM and VSWR swept, and micro data center racks undergo full thermal and UPS load testing prior to dispatch.
Pan-India Site Check, Installation & SLA Support
Our own field engineering teams conduct pre-deployment site checks covering power, earthing, floor loading, thermal heat rejection and cable pathways. We deliver complete bills of quantities (BOQs), CAD layout drawings, on-site commissioning and annual maintenance contracts (AMC) with 24×7 remote telemetry monitoring and guaranteed response SLAs.
How quickly can Semita Nexis deliver and commission Data Center & Edge in India?
Standard connectivity, optical transceivers, fiber cables and rack accessories ship from our Indian plants within 1 to 3 weeks. Pre-integrated NexisRack micro data centers typically ship in 6 to 10 weeks and NexisImmersion liquid cooling systems in 8 to 12 weeks, with on-site installation and commissioning completed in a few days.
Can Semita Nexis customize configurations and provide project BOQs?
Yes. Our application engineers size and customize fiber core counts, trunk breakout lengths, transceiver vendor coding, rack U-heights, UPS battery runtimes and cooling capacities to match your exact site and workload. Contact our engineering team at sales@semita.in or +91-92122-94293 for a tailored BOQ within one business day.
What certifications and test reports accompany each shipment?
All deliveries include factory serialized test reports (OTDR traces, IL/RL certificates, PIM sweep charts or integrated rack FAT protocols) along with ISO 9001/14001/45001, RoHS, CE and applicable DoT/TEC conformity documentation.